|

In March,
1998, Polymer Services, LLC performed a gel treatment to control excessive
water production on a short radius horizontal completion in the Arbuckle
Dolomite Formation in Cowley County, Kansas.
The well
had been completed in October, 1996, for an initial production of 950
BOPD, no water. Due to the reservoir heterogeneity of this naturally fractured
dolomite formation, water encroachment occurred rapidly through vertical
fractures intersected by the wellbore.
The operator
tried to isolate the water section using dual inflatable packers, but
the water quickly re-invaded the wellbore through the extensive fracture
network. When the operator contacted PSI for a recommendation, the well
was only producing a trace of oil and 1150 BWPD.
Polymer Services
designed and pumped a 500 bbl polymer gel treatment through the existing
completion system. 120 days after treatment, the well has stabilized at
40 BOPD, 620 BWPD. An
additional treatment plan is currently being developed to block off a
second known water horizon, and facilitate removal of the inflatable packer
system.

Polymer Services
has the field proven technology to reduce excessive water production,
and increase daily oil rated from horizontal well completions. This technology
will reduce lifting costs and improve the profitability of horizontal
wells. If you have wells exhibiting excess water production, with declining
oil recovery rates, call us and let us design a water-blocking gel treatment
for the well. This technology will improve your bottom line.

|